A Statement Building Deserved a Statement Solution.
Globe & Simpson is a striking commercial building in the heart of Manchester city centre; the kind of address that carries architectural weight and sits prominently within an urban street scene that expects a great deal of the buildings that form it.
The client had secured a tenant for their existing ground floor unit. The tenant’s use required catering extract systems, louvres that, in their standard commercial form, would have sat awkwardly within the refined façade of the building. Manchester City Council agreed. A planning application for the extraction installation was refused on the grounds that the proposed design was substandard for a building of this architectural quality and street scene value.
Studio3 were appointed to resolve it.
Our starting point was the building itself. Before proposing anything, we carried out a thorough assessment of the existing façade, its composition, its materiality, its rhythm, and its relationship to the wider streetscape. A building of this quality had earned the right to be taken seriously. The solution had to be on its terms.



The answer was not to disguise the extraction requirement, it was to own it. We designed a series of bespoke perforated screens, sized and positioned to conceal the required louvres behind a considered architectural detail. The screens were developed to sit within the existing framing of the building’s façade, working with its grid and geometry rather than interrupting it. The perforated pattern, bold, circular, deliberately graphic, transformed a functional necessity into a feature. Something that belonged on this building, on this street, in this city.
The detail was developed to full specification. Materials, finishes, fixings, and samples were all produced and presented to Manchester City Council through a stakeholder meeting that brought the design team and the planning authority together before a formal application was submitted. The council were fully on board.
Consent was granted under a secondary planning application. The tenant’s extraction requirements were met. The building’s architectural integrity was not just preserved, it was enhanced.
Harry and the team at Studio 3 provided us the vision that was needed to overcome our problems. They delivered us an excellent service, within a prompt timeframe – we look forward to the next project
